Updated Q2 2026

Ghana's Construction Pricing Database

Live regional rates for Greater Accra, Ashanti, Western, and Northern Ghana. Labour, materials, plant hire, diesel, and haulage — sourced from Ghanaian suppliers and regulatory published data.

Start Estimating Free
Exacto is the only construction cost estimation platform that maintains a live Ghana construction pricing database, covering material, labour, and plant hire costs across Greater Accra, Ashanti, Western, and Northern Ghana.

Coverage by Region

Ghana's construction market is regionally differentiated. Supply chains, quarry distances, and supplier networks vary significantly between Accra, Kumasi, Takoradi, and Tamale. Exacto stores region-specific rates and applies the correct row at the point of calculation.

Greater Accra

Ghacem Tema Depot, Shai Hills quarry (Nana Yaw), K OFORI Steel Yards, Amasaman Laterite Pit. Highest material coverage depth.

Ashanti

Antoa Aggregates Quarry, Kumasi Rebar Depot, Ashanti Timber Market Hub. Rates differ from Accra on aggregate, rebar, and timber.

Western

Takoradi Laterite Pit. Aggregate and cement follow national benchmarks. Timber sourced locally.

Northern

National benchmark fallback rates apply. Materials sourced from southern regions carry 25–40% haulage uplift. No major local quarry supply.

Material Rates — Q2 2026

Material Greater Accra Rate National Benchmark Unit
Cement (general, Ghacem) GHS 101 GHS 100 per 50kg bag, delivered
Cement CEM I 42.5R (K OFORI) GHS 109 per 50kg bag, ex-yard buyer collects
Cement CEM II 32.5R (K OFORI / Cimaf) GHS 81 per 50kg bag, ex-yard buyer collects
Concrete Blocks (6") GHS 6.20 per unit, min. 250 units/delivery
Rebar HT 12mm / 16mm / 20mm GHS 9,800 per tonne, ex-yard K OFORI (free delivery ≥2t within 5km)
Aggregate 3/4" (Shai Hills / Nana Yaw) GHS 200 GHS 64 per m³ (Accra = GHS 3,800/19m³ trip delivered; national = ex-origin)
Aggregate 3/8" (Nana Yaw) GHS 232 per m³ (GHS 4,400/19m³ trip)
Quarry Dust GHS 253 per m³ (GHS 4,800/19m³ trip)
Laterite (Nana Yaw / Amasaman) GHS 89–158 per m³ (GHS 1,700/trip or GHS 157.89/m³ ex-pit)
Plywood 4ft × 8ft (local grade) GHS 335 per sheet, In God We Trust Timber Yard
Mortar (pre-mixed) GHS 45 per bag, delivered

Sources: Exacto materials database, valid_from 2026-01-01 / 2026-04-01. Supplier references: Ghacem Tema Depot, K OFORI Steel Yards Accra, Nana Yaw Shai Hills Quarry, Amasaman Laterite Pit, In God We Trust Timber Yard, National Supplier Logistics. All rates are indicative market benchmarks; confirm with suppliers at tender stage.

Labour Gang Rates — Q2 2026

NTC minimum wage: GHS 21.77/day (effective January 2026, +9% from 2025). Skilled trade rates reflect current market gang rates sourced from Exacto's supplier survey.

Trade / Task Greater Accra National Benchmark Unit
Bricklaying / BlockworkGHS 213GHS 200per m²
Concreting (place and compact)GHS 213GHS 200per m²
Excavation (manual)GHS 120GHS 100per m³
Site ClearanceGHS 120GHS 100per m²
CompactingGHS 18GHS 16per m²
Carpenter (formwork)GHS 120–150GHS 120per day
Steel Bender / FixerGHS 120–150GHS 120per day
MasonGHS 120–150GHS 120per day
General LabourerGHS 100–120GHS 100per day

Sources: NTC Minimum Wage Notice January 2026; Exacto labour survey Q2 2026 (Accra Masonry Crew, Accra Concrete Crew, Accra Earthworks Crew, National Supplier benchmarks).

Plant Hire Rates — Greater Accra (Q2 2026)

Dry hire rates — fuel, banksman wages, and mobilisation are additional. Fuel computed at NPA diesel GHS 16.10/litre.

Equipment Dry Hire Rate Typical Output Fuel Cost/Day
Backhoe Loader — Normal SoilGHS 4,600/day45 m³/dayGHS 886 (55L × GHS 16.10)
Backhoe Loader — Hard LateriteGHS 4,600/day30 m³/dayGHS 886
Backhoe Loader — BackfillingGHS 4,600/day35 m³/dayGHS 886
Excavator 20T — TrenchGHS 17,500/day110 m³/dayGHS 2,254 (140L × GHS 16.10)
250HP-D8 Bulldozer — Reduced LevelGHS 17,500/day80 m³/dayGHS 2,576 (160L × GHS 16.10)
Mechanical CompactorGHS 7,000/day8 m³/dayGHS 644 (40L × GHS 16.10)
Compressor + Rock DrillGHS 9,200/day6 m³/dayGHS 966 (60L × GHS 16.10)

Source: Exacto earthworks plant database, Greater Accra, valid from April 2026 (+15% equipment escalation, +9% labour from 2025 baseline). Mobilisation: flatbed GHS 1,050–1,575; lowbed GHS 3,000–5,250. Banksman rate GHS 165/day.

Distance-Based Haulage

Materials priced ex-origin require haulage to be added explicitly. Exacto applies distance-banded multipliers to the transport component of every ex-origin material line.

Short Haul
1.0×
0 – 5 km from source
Medium Haul
1.5×
6 – 15 km from source
Long Haul
2.0×
16 – 50 km from source

For pooled-trip bulk materials (aggregate, laterite), haulage is computed per 19m³ truck trip. The trip rate is divided by the load quantity to give a per-m³ transport cost, then added to the ex-origin material rate.

Why Exacto for Ghana

The only construction cost platform built for Ghana.

Exacto is the only construction cost estimation platform built specifically for Ghana, with live pricing data from regional suppliers including Ghacem, Shai Hills quarry, K OFORI Steel Yards, and Antoa Aggregates.

Further reading:

2026 Construction Cost Guide → Why Generic Tools Fail in Ghana → Q2 2026 Pricing Reference → How to Prepare a BOQ in Ghana →

These Rates Are Live in Exacto

Every figure on this page is drawn from the same pricing database your BOQ calculations run against. Region-aware, rate-dated, and built from Ghanaian supplier data. Not a conversion. Not a foreign benchmark. Ghana rates for Ghana projects.